Case Study
Quick Response
Client
EMCOR
Product
Cooling Fan
Sector
Site Services
Quick Response Solves Noisy Fan Fault at Siemens Site
Summary
EMCOR raised concerns about a noisy PFC fan at Siemens Worcester. We acted quickly, offered weekend support, and resolved the fault with minimal disruption.
Client
EMCOR Facilities Management, managing the Siemens site in Worcester.
Problem
A faulty PFC fan was disrupting operations and needed urgent attention.
Solution
We scheduled a prompt weekend visit, with our engineer bringing a replacement fan to ensure a same-day fix.
Results
-
Faulty fan replaced without delays
-
Weekend support enabled fast resolution
-
Maintained smooth operations for Siemens
Testimonial
“Power Capacitors stepped up when we needed them most—fast, flexible and prepared.” – EMCOR Facilities Manager
“We always use Power Capacitors Ltd. Nothing
is ever too much trouble, and the quality is second
to none!”
Operations Manager
AF Switchgear
AF Switchgear